Skip to main content

MC authority: cost, insurance requirements and how long it takes

What a new for-hire carrier, broker or freight forwarder pays and files to get an MC number, and how long FMCSA says it takes.

FMCSA lists a one-time $300 filing fee for each type of operating authority (MC, FF or MX), non-refundable, with separate fees for each kind you apply for. After you apply you must also file a BOC-3 process agent and proof of insurance: for general-freight carriers of non-hazardous property in vehicles of 10,001 pounds or more, 49 CFR 387.9 sets a $750,000 minimum. FMCSA says online applications from new applicants may take 20 to 25 business days, longer if the agency reviews them further, and the regulations give interested persons 10 days after FMCSA Register publication to protest.

Read November 18, 2026. Sources: FMCSA, 49 CFR on eCFR. Not affiliated with FMCSA or USDOT; we do not file applications.

What FMCSA charges and what each step costs

FMCSA “Get Operating Authority (Docket Number)” page, archived November 4, 2026 (page last updated April 20, 2026); read November 18, 2026.
ItemAmountNote
Permanent operating authority (MC, FF or MX)$300.00 per authority typeOne-time; “FMCSA does not refund application fees”. Separate fees for each kind of authority sought
Notice of name change$14.00As listed on the same page
Reinstate authority$80.00As listed on the same page
BOC-3 process agentNot stated by FMCSAFiled by a process-agent company, which sets its own price
Insurance filing (BMC-91 / 91X)Not stated by FMCSAYour insurer files it; premium depends on the insurer
Property broker bond or trust fund (BMC-84 / 85)$75,000 required security; premium not stated49 CFR 387.307: a surety bond or trust fund of $75,000

FMCSA: Get Operating Authority. FMCSA’s site returned an access error to our fetcher, so the figures above were read from the Internet Archive’s copy of that page.

Insurance minimums by operation type

49 CFR 387.9, Table 1, Schedule of Limits, public liability (eCFR, read November 18, 2026).
Type of carriageCommodityMinimum
For-hire, interstate or foreign commerce, GVWR 10,001+ lbProperty (nonhazardous)$750,000
For-hire and private, interstate, foreign or intrastate, GVWR 10,001+ lbHazardous substances in bulk in cargo tanks, portable tanks or hopper-type vehicles; certain bulk Division 1.1, 1.2, 1.3, 2.1, 2.2, 2.3 and 6.1 materials; highway route controlled quantities of Class 7$5,000,000
For-hire and private, interstate or foreign (any quantity) or intrastate (bulk only), GVWR 10,001+ lbOil listed in 49 CFR 172.101; hazardous waste, materials and substances listed in 172.101 not covered by the rows above and below$1,000,000
For-hire and private, interstate or foreign, GVWR under 10,001 lbCertain bulk Division 1.1, 1.2, 1.3 materials, Hazard Zone A gases and toxics, and highway route controlled quantities of Class 7$5,000,000

Other figures in 49 CFR 387.303 (small freight vehicles under 10,001 pounds, $300,000; passenger carriers; household goods cargo liability of $5,000 per vehicle and $10,000 per occurrence) are printed in the eCFR, but the section carries an effective-date note saying it was suspended indefinitely, so check with FMCSA before relying on them. Property brokers file the $75,000 bond or trust fund in 49 CFR 387.307. Household goods carriers and freight forwarders have additional filings; read the regulations or ask FMCSA.

To see whether a carrier’s filings are on record, use the FMCSA insurance lookup and the BOC-3 lookup.

How long it takes and what the rules say about waiting

As FMCSA and 49 CFR state it; read November 18, 2026. Nothing here is added from other websites.
StageWhat is statedSource
Online application (new applicant, URS)“may take 20-25 business days, unless they are subject to further review by the agency, in which case it could take an additional 8 weeks or longer”FMCSA, Get Operating Authority
Mailed application (existing carrier)“may take 45-60 business days”FMCSA, Get Operating Authority
Notice and protest periodInterested persons have 10 days from the date of FMCSA Register publication to file protests; with no opposition the grant becomes effective by issuance of a certificate, permit or license49 CFR 365.115
Insurance and BOC-3 filingsEvidence of financial responsibility and Form BOC-3 are due within 90 days from the date notice of the application is published in the FMCSA Register49 CFR 365.109(a)(5)-(6)
Documents after the grant“Normally, operating authority documents are sent out within 3-4 business days after number has been granted”; call FMCSA if 10 or more business days passFMCSA, Get Operating Authority

The eCFR carries effective-date notes saying several of the sections cited on this page (360.3, 365.105, 365.109, 387.303) are suspended pending FMCSA’s registration modernization; the fees and timing in the first two tables come from FMCSA’s own registration page, and 387.9 is in force.

The sources above give separate figures for each stage and we do not add them into a single “days until active” number. To see when authority was granted, FMCSA says to open the carrier’s Authority History in the Licensing and Insurance system, or use our MC number lookup.

UCR and other annual filings

UCR is separate from authority and is paid every year. See the 2027 UCR fee table and put the recurring dates in the DOT filing calendar. What brokers look for once you are active is in the new authority guide.

Sources

Frequently asked questions

›How much does an MC number cost?

FMCSA’s Get Operating Authority page (copy archived November 4, 2026; page last updated April 20, 2026) lists Permanent Authority at $300.00, with separate fees for each kind of authority sought and no refunds for mistaken applications. The fee is for the authority itself; the BOC-3 and insurance are paid to the agent and the insurer or surety, and FMCSA does not state their prices.

›How long does it take to get MC authority?

FMCSA’s page says URS applications from new applicants may take 20 to 25 business days, unless they are subject to further review, in which case it could take an additional 8 weeks or longer. Operating authority documents are normally sent 3 to 4 business days after the number is granted.

›What is the protest period for new authority?

49 CFR 365.115(a) says interested persons have 10 days from the date of FMCSA Register publication to file protests, and (b) says that if no one opposes the application the grant becomes effective by issuance of a certificate, permit or license.

›How much insurance do I need for MC authority?

For a for-hire carrier of non-hazardous property in interstate commerce with a GVWR of 10,001 pounds or more, 49 CFR 387.9 sets $750,000. Carriers of certain bulk hazardous materials need $5,000,000 and of other listed oil and hazardous materials $1,000,000. Property brokers need a $75,000 surety bond or trust fund (49 CFR 387.307).

›Do I need a BOC-3 and who files it?

49 CFR 365.109(a)(6) says applicants must submit Form BOC-3 (designation of agents) within 90 days from the date notice of the application is published in the FMCSA Register. A process-agent company files it for you; FMCSA does not set the agent’s price.

›Is UCR part of the MC authority cost?

No. UCR is a separate annual registration paid to your base state or the UCR plan. The 2027 fees run from $55 to $54,165 by fleet size.